Table 2 Construction and maintenance of infrastructure waste in Tehran
From: Quality and quantity of construction and demolition waste in Tehran
Laminating, cutting and manual asphalt (m2) | Creek and curb (m) | Pavement (m2) | Bridge (m) | Tunnel (m) | Stabilization, such as separation wall (m2) | Parks (m2) | Digging and wells (m3) |
|---|---|---|---|---|---|---|---|
5,909,774 | 2,242,456 | 1,112,491 | 652,038 | 225,200 | 617,334 | 3,293,286 | 1,317,097 |