Abstract
Fire following earthquake is a little recognized risk in seismic regions with significant wood building inventories. Methods exist for quantifying this risk, and examples are provided in this chapter for San Francisco, Istanbul and Montreal. There are many opportunities for reducing this risk, and examples are provided regarding reducing fire station vulnerability and improving emergency firefighting water supply. Once accomplished however, vigilance is required to maintain these mitigation measures.
You have full access to this open access chapter, Download chapter PDF
Similar content being viewed by others
1 Introduction
Fire following earthquake refers to a series of events or a stochastic process initiated by a large earthquake. Fires occur following all earthquakes that significantly shake a human settlement but are generally only a very significant problem in a large metropolitan area predominantly comprised of densely spaced buildings. In such circumstances, the multiple simultaneous ignitions can lead to catastrophic conflagrations that by far are the dominant agent of damage for that event. Regions of high seismicity with large metropolitan areas predominantly comprised of densely spaced wood buildings are particularly at risk, and include Japan, New Zealand, parts of Europe and western North America. Istanbul is a major metropolitan area subject to large earthquakes that has historically sustained large conflagrations, so that the potential for fire following earthquake losses is a significant concern and the focus of this chapter.
Large fires, for example measured in terms of square kilometers of burnt area, have not been unique to fires following earthquakes—indeed, the great fires of London (1666) and Chicago (1871) are only the most noteworthy of a long succession of non-earthquake related urban peace-time conflagrations. Istanbul in its long history has had a number of large conflagrations:
… the terrible earthquake which took place in 1509, known as “the Little Day of Judgment”, dealt a terrible blow to the city's brick and stone houses. Fearing the effects of further earthquakes people began to build their houses of wood instead and in a short space of time Istanbul became a city of wooden houses. … This inevitably led to a rapid increase in the number of fires in the city. As well as the earthquakes of 1765 and 1894, which also caused terrible destruction, Istanbul's greatest enemy has always been fire. …Sometimes these fires would start from the banks of the Golden Horn and burn until they reached Aksaray or even the Sea of Marmara. The last great fires of Istanbul were the Hocapaşa fire of 1865, the Beyoglu fire of 1870, the Laleli fire of 1911, the Gedikpaşa fire of 1912 and the Cibali-Fatih-Altınmermer fire of 1918. …The last big fire of this kind destroyed a large part of the Fener district in 1941 (Ansal 2003).
Still, the two largest peace-time urban conflagrations in history have been fires following earthquakes—1906 San Francisco and 1923 Tokyo, the latter resulting in the great majority of the 140,000 fatalities.
Although a combination of a professionalized fire service, improved water supply and better building practices has largely eliminated non-earthquake related large urban conflagrations in Istanbul, there is still a gap—an Achilles Heel—which is fire following earthquake. This is due to the correlated effects of a large earthquake simultaneously causing numerous ignitions, degrading building fire resistive features, dropping pressure in water supply mains, saturating communications and transportation routes, and thus allowing some fires to quickly grow into conflagrations that outstrip local resources. It is not sufficiently appreciated that the key to modern fire protection is a well-drilled rapid response by professional firefighters in the early stages of structural fires, arriving in time to suppress the fires while that is still relatively feasible. A typical response goal for urban fire departments for example is 4 min from time of report to arrival. If suppression is delayed, due either to delayed response, or lack of water, a single structural fire can quickly spread to neighboring buildings and grow to the point where an entire municipalities’ fire resources are required, and perhaps even assistance from neighboring communities. This is for a single ignition. Simply put, most fire departments are not sized or equipped to cope with the fires following a major earthquake. A major earthquake and its associated fires is a low probability event for which, although having very high potential consequences, it may not be feasible to adequately prepare.
2 Analysis of Fire Following Earthquake
The first step towards solving any problem is analyzing the problem and quantifying its effects. A full probabilistic methodology for analysis of fire following earthquake was developed in the late 1970s (Scawthorn et al. 1981) and applied to major cities in western North America (Scawthorn and Khater 1992), Japan and Istanbul, the methods for which are detailed in (Scawthorn et al. 2005), so that only a brief review is presented here. In summary, the steps in the process are:
-
Occurrence of the earthquake—causing damage to buildings and contents, even if the damage is as simple as knockings things (such as candles or lamps) over.
-
Ignition—whether a structure has been damaged or not, ignitions will occur due to earthquakes. The sources of ignitions are numerous, ranging from overturned heat sources, to abraded and shorted electrical wiring, to spilled chemicals having exothermic reactions, to friction of things rubbing together.
-
Discovery—at some point, the fire resulting from the ignition will be discovered, if it has not self-extinguished (this aspect is discussed further, below). In the confusion following an earthquake, the discovery may take longer than it might otherwise.
-
Report—if it is not possible for the person or persons discovering the fire to immediately extinguish it, fire department response will be required. For the fire department to respond, a Report to the fire department has to be made. Communications system dysfunction and saturation will delay many reports.
-
Response—the fire department then has to respond, but is impeded by non-fire damage emergencies they may have to respond to (e.g., building collapse) as well as transportation disruptions.
-
Suppression—the fire department then has to suppress the fire. If the fire department is successful, they move on to the next incident. If the fire department is not successful, they continue to attempt to control the fire, but it spreads and becomes a conflagration. Success or failure hinges on numerous factors including water supply functionality, building construction and density, wind and humidity conditions, etc. If unable to contain the fire, the process ends when the fuel is exhausted or when the fire comes to a firebreak.
This process is also shown in Fig. 13.1 which is a Fire Department Operations Timeline. Time is of the essence for the fire following earthquake problem. In this figure, the horizontal axis is Time, beginning at the time of the earthquake, while the vertical axis presents a series of horizontal bars of varying width. Each of these bars depicts the development of one fire, from ignition through growth or increasing size (size is indicated by the width or number of bars). Fire following earthquake is a highly non-linear process, modeling of which does not have great precision and is such that in many cases the only clear result is differentiation between situations of a few small fires, versus major conflagration.
2.1 Assets at Risk and Ignitions
Ignitions are a function of shaking intensity and the total amount of building floor area exposed to that shaking—the more buildings, the more sources of ignitions. Figure 13.2 shows total building floor area (in sq. m., per 0.01° grid cell) for Istanbul. While Istanbul was historically composed primarily of wood buildings, in recent decades the region’s building stock has become almost entirely masonry and reinforced concrete—good for fire, questionable for earthquake.
Figure 13.3 shows estimated shaking intensity for a M7.5 earthquake expected to occur on the North Anatolian fault in close proximity to Istanbul (Ansal 2003). The actual number of ignitions varies with each ground shaking scenario—for the M7.5 event most of the Study Area would be subjected to PGAs of 0.1—0.4 g, meaning that the total number of ignitions would number perhaps one to two hundred. For comparison, a rule of thumb for ignitions is presented in Table 13.1, where it can be seen that for a population shaken at Modified Mercalli Intensity (MMI) VIII, there will be approximately one fire following earthquake requiring fire department assistance for each 10.5 million sq. ft. of floor area—that is, for approximately 7,000 single family dwellings, or a residential population of about 25,000.
These are ignitions that require fire department response—there will be other, usually minor, ignitions that are suppressed immediately by citizens and typically not even reported.
The cause of these ignitions would likely be similar to causes in the 1994 Northridge earthquake, which is the best US data set for recent fires following an earthquake—about half of all ignitions would be electrical related, a quarter gas-related, and the other due to a variety of causes, including chemical reaction. Also based on the Northridge experience, about half of all ignitions would typically occur in single family residential dwellings, with another 26% in multi-family residential occupancies—that is, about 70% of all ignitions occur in residential occupancies. Educational facilities would be a small percentage of all ignitions (3% in Northridge), and most of these are due to exothermic reactions of spilled chemicals in chemistry laboratories.
A particular concern is oil refineries, tank farms and related energy facilities. When strongly shaken, oil refineries and tank farms have typically had large fires which have burned for days. Examples include the Showa refinery in the 1964 Niigata (Japan) earthquake, the Tüpraş refinery in the 1999 Marmara (Turkey) Earthquake (Fig. 13.4) and the Idemitsukosan Hokkaido refinery fire in the 2003 Tokachi-oki earthquake.
2.2 Communications/Water Supply
The performance of lifelines, such as water supply, gas, electric power, communications and transportation, is integral to the fire following earthquake process.
Water supply may be severely impacted, depending on the scenario event. Generally, only the water distribution system is relevant to the fire following earthquake process. Water pressure will drop in some portions of the more heavily shaken area due to pipe breaks and tank failures. Water distribution system failure is a function of pipe material, diameter, and soil type, which for Istanbul is shown in Fig. 13.5.
Gas-related ignitions typically account for about 25% of the total number of ignitions. The Istanbul Gas Company (IGDAŞ) system is a relatively new system, Fig. 13.6, and is considered likely to suffer relatively less damage compared with older systems, such as in California (even though these systems are devoting considerable resources to modernization). IGDAŞ also has some capacity for remotely shutting trunk line valves. Nevertheless, the overall impact is that gas related ignitions may be somewhat lower than in California or Japan, due to the relatively light damage the IGDAŞ system is likely to sustain.
Communications systems, particularly telephone, will sustain some damage but not enough to reduce functionality following the scenario event. However, saturation will reduce functionality to a great degree, for several hours or more. This lack of telephone service will result in delayed reporting, with consequences as discussed above.
The transportation system most relevant to fire following earthquake is the road network, which are most vulnerable at bridge crossings. However, for Istanbul the distribution of fire stations is such that road blockage is unlikely to be a major factor, Fig. 13.7.
2.3 Fire Spread
Depending on the specific event, only a very few of Istanbul’s initial few hundred ignitions will develop into conflagrations. The precise number varies with wind speed and other factors and is difficult to summarize, but an idea can be gained by again assuming a uniform PGA distribution using San Francisco, California, as a study area, Fig. 13.8. The number can be seen to be significantly less than the total number of ignitions.
3 FFE Risk for Several Cities
The above methods have been applied by the author to a number of cities including San Francisco, Los Angeles, Istanbul, Montreal and Tokyo, for purposes as varied as insurance underwriting, water supply reliability assessment, and emergency planning. In these studies, methods vary from fully deterministic, in which earthquake, wind and other factors are fixed and an average number of fires and associated loss are estimated, to fully probabilistic, in which uncertainty in all relevant factors is considered, and a full probabilistic distribution of losses is analyzed. Other studies are intermediate between these two extremes, varying only several key factors. Monte Carlo and other simulation techniques are commonly employed in these analyses. An example of a relatively deterministic analysis is shown in Fig. 13.9 and Table 13.2, for the city of San Francisco, California (ATC-52-1 2010).
Another example is shown Fig. 13.10 for Montreal Canada, for three earthquake scenarios varying from magnitude 6.5–7. Accounting for fire department response, water system damage, weather and other conditions, the growth and ultimate final burnt area of fires were estimated and in summary found to result in losses of between $10 billion and $30 billion, Table 13.3 (Scawthorn 2019). These are median estimates—there are smaller probabilities of greater or less damage and the range is a function of the specific earthquake scenario (i.e., location and magnitude), time of day, weather and other factors, as shown in Fig. 13.11.
4 FFE Mitigation
Mitigation of fire following earthquake has been extensively discussed elsewhere (Scawthorn et al. 2005), so that only some limited recommendations are provided here, structured according to opportunities for improving fire department response and water service reliability and reducing building post-earthquake fire vulnerability.
4.1 Fire Station Vulnerability
Fire stations and other facilities in seismically hazardous areas require immediate post-earthquake functionality and should be evaluated according to modern methods for essential facilities. In many cities, fire stations can be as much as 100 years old, and in many cases were built before 1980, which is generally considered the beginning of modern seismic design. Fire station seismic vulnerability and its effects, directly on firefighter health and safety and indirectly on the ability of the fire apparatus to respond, has long been recognized and is now well quantified, Fig. 13.12. San Francisco, Los Angeles, Vancouver, B.C., Seattle and other cities have spent millions of dollars reinforcing and replacing aged stations, specifically due to seismic vulnerability concerns (Figs. 13.12 and 13.13).
4.2 Firefighting Water Capacity
Most cities lie on or near a shore, bay, river or other body of water, as San Francisco did in 1906—indeed, San Francisco had direct access to the largest body of water on earth—yet burned for three days due to lack of firefighting water. Why? Because, similar to the Ancient Mariner, while ‘water water [was] everywhere’, San Francisco could not move it to where the fires were. A similar situation exists in many cities today, which would have significant difficulty in pumping/relaying water. This situation is not unique but is also not acceptable.
Alternative water supply sources need to be better identified, and access and water transport capabilities enhanced. Large diameter hose (LDH) systems, comparable to San Francisco Fire Department’s or Vallejo FD’s Portable Water Supply System (PWSS) Fig. 13.14 or Vancouver B.C.’s new LDH hose reel system, Fig. 13.15, should be developed on a regional basis. Note that a PWSS has wider applicability than just earthquake—it can be used in the case of water main breaks to provide potable supply, for wildfires and for dewatering of flooded areas. See Scawthorn (2011) for further details.
5 Concluding Remarks
In selected urban regions of high seismicity and wood building inventory, fire following earthquake is a significant but little recognized risk. Analyses in many regions has quantified this risk and led to significant mitigation which has reduced the risk. Once accomplished however, vigilance is required to maintain the mitigation measures.
References
Ansal AE (2003) Earthquake master plan for Istanbul. pp. 569. Boğaziçi University, Istanbul Technical University, Middle East Technical University, Yildiz Technical University, for the Metropolitan Municipality of Istanbul, Planning and Construction Directorate, Geotechnical and Earthquake Investigation Department, Istanbul
ATC-52–1 (2010) Here today—here tomorrow: the road to earthquake resilience in San Francisco, potential earthquake impacts. In: San Francisco: Prepared for the Department of Building Inspection, City and County of San Francisco, under the Community Action Plan for Seismic Safety (CAPSS) Project by the Applied Technology Council
Bello M, Bott J (2006) San Francisco bay area fire stations—Seismic risk assessment. In: Proceedings of the 8th U.S. national conference on earthquake engineering, Paper No. 001662, San Francisco
History of Istanbul. https://www.istanbul-istanbul.net/history/history10.htm
Scawthorn C (2000) The Marmara, Turkey Earthquake of August 17, 1999: Reconnaissance Report, MCEER Tech. Rpt. MCEER-00–0001, Multidisciplinary Center for Extreme Events Report, State University of New York at Buffalo
Scawthorn C (2011) Water supply in regards to fire following earthquakes. In: 173. Berkeley: Pacific Earthquake Engineering Research Center, College of Engineering, University of California, sponsored by the California Seismic Safety Commission. www.seismic.ca.gov/pub/CSSC_2011-02_WaterSupply_PEER.pdf with four page summary at https://peer.berkeley.edu/publications/peer_reports/reports_2011/Fire%20Following%20Earthquake-online-view-layout-sm.pdf
Scawthorn C (2018) Fire following the Mw 7.05 Haywired earthquake scenario. In: Detweiler ST, Wein AM (eds.) The HayWired Earthquake scenario—engineering implications (U.S. geological survey scientific investigations report 2017–5013–I–Q: Washington)
Scawthorn C (2019) Fire following earthquake in the Montreal Region. In: 100 pp. Toronto. https://www.iclr.org/wp-content/uploads/2019/11/Montreal-fire-following-earthquake_E.pdf : Prepared for Institute for Catastrophic Loss Reduction
Scawthorn C, Khater M (1992) Fire following earthquake—conflagration potential in the greater Los Angeles San Francisco Seattle and Memphis Areas. prepared for the Natural Disaster Coalition by EQE International, San Francisco, CA. [EQE's study for the Natural Disaster Coalition, Fire Following Earthquake in the Greater Los Angeles, San Francisco, Seattle and Memphis Areas, is available from the National Committee on Property Insurance, 75 Tremont Street, Suite 510, Boston, MA 02108–3910, (617. 722–0200.]
Scawthorn C, Yamada Y, Iemura H (1981) A model for urban postearthquake fire hazard. Disasters 5(2):125–132
Scawthorn C, Eidinger JM, Schiff AJ (2005) Fire following earthquake. Technical council on lifeline earthquake engineering monograph No. 26, American Society of Civil Engineers, Reston, 345pp
Acknowledgements
The Turkish Catastrophe Insurance Pool (TCIP) is thanked for the sponsorship and the Organizing Committee for their efforts to hold the International Workshop on Advances in Assessment and Modelling of Earthquake Loss in Istanbul in November 2019. Prof. Mustafa Erdik is particularly thanked for his leadership in this and many other earthquake risk reduction efforts. Willis Re and in particular Mr. Iman Karimi, are thanked for their sponsoring of studies of fire following earthquake for Istanbul.
Author information
Authors and Affiliations
Corresponding author
Editor information
Editors and Affiliations
Rights and permissions
Open Access This chapter is licensed under the terms of the Creative Commons Attribution 4.0 International License (http://creativecommons.org/licenses/by/4.0/), which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons license and indicate if changes were made.
The images or other third party material in this chapter are included in the chapter's Creative Commons license, unless indicated otherwise in a credit line to the material. If material is not included in the chapter's Creative Commons license and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder.
Copyright information
© 2021 The Author(s)
About this chapter
Cite this chapter
Scawthorn, C. (2021). Fire Following Earthquake—The Potential in Istanbul. In: Akkar, S., Ilki, A., Goksu, C., Erdik, M. (eds) Advances in Assessment and Modeling of Earthquake Loss. Springer Tracts in Civil Engineering . Springer, Cham. https://doi.org/10.1007/978-3-030-68813-4_13
Download citation
DOI: https://doi.org/10.1007/978-3-030-68813-4_13
Published:
Publisher Name: Springer, Cham
Print ISBN: 978-3-030-68812-7
Online ISBN: 978-3-030-68813-4
eBook Packages: EngineeringEngineering (R0)